Selçuk Zeybek

Contracts • Planning • Delay Analysis

Hello — I'm Selçuk Zeybek.

A contracts and planning professional working on major railway and infrastructure projects. I spend my days inside FIDIC contracts, Primavera programmes, and the question of why projects run late — and how to prove it.

Read my notesarrow_forward
Railway under construction at dawn — freshly laid track, catenary gantries and formation works
0
years in contract management
0
continents worked across
0
km of railway delivered
0
concurrent projects

What I Work On

Areas of Expertise

Fifteen years on the contractor side of major construction contracts — from notice management through to dispute proceedings.

Yellow — Plant & Design-Build.The Contractor designs to the Employer’s Requirements — my home ground: 1.9 errors, 4.12 conditions, 20.1 notices. Read the 1.9 note →

drag the shelf · pick a book

FIDIC Claims

Preparation and substantiation of EOT, variation, and compliance claims under FIDIC forms — from first notice through to determination and DAB proceedings.

Forensic Delay Analysis

Evidence-driven critical path analysis — baseline vs. as-built comparison, delay event quantification, and disruption assessment to SCL Protocol principles.

Contract Administration

The day-to-day discipline of notices, records, and correspondence that keeps a contractual position intact — so an entitlement is never lost to a procedural defect.

The Road So Far

Career

Fifteen-plus years, four continents, and a lot of railway.

  1. The beginning

    Turkey

    Planning and contract roles on major construction projects — learning the trade where the programme meets the ground.

  2. East Africa

    Ethiopia

    The Awash–Kombolcha railway: contract administration and claims on a landmark East African rail project.

  3. Abroad

    Georgia & UAE

    International postings across rail and infrastructure works, on both the planning and contracts sides of the table.

  4. Disputes

    International arbitration

    Forensic delay and disruption analysis for international arbitration proceedings, in association with HKA and ICM.

  5. Today

    Major railway portfolio

    Senior Contracts & Planning Manager with a leading international contractor, across a portfolio of four concurrent railway projects totalling 1,225 km.

Show, don't tell

How a claim is built, step by step.

Illustrated notes on delay analysis, disruption, prolongation cost, and variations — the FIDIC and SCL mechanics, hand-drawn.

Read the Notes →

Background

About Selçuk Zeybek

Contract and Planning Manager with 15+ years of international experience in contract administration, turnover management, and dispute evidence on multi-billion dollar railway and infrastructure projects across four continents.

Currently a Senior Contracts & Planning Manager with a leading international contractor, working across a portfolio of concurrent railway projects in East Africa.

Career spanning diverse projects in Turkey, Ethiopia, Georgia, and the UAE — including forensic delay and disruption analysis for international arbitration proceedings in association with HKA and ICM.

Modern railway viaduct curving through a landscapeInternational Experience

Get In Touch

Say Hello

Questions about the notes, FIDIC and delay analysis shop talk, or anything else — my inbox is always open.

phone_iphone

Phone / WhatsApp

+90 532 708 2088
location_on

Location

Istanbul, Türkiye